MWM Series 1600kW Sewage Gas CHP Unit to Indonesia
May. 25, 2017- The gas power plant consist in 2×800KW MWM gas engine CHPs working in parallel, containerized Cogeneration units, with merits of Optimum Efficiency, Full Turbopower and High Reliability, with electrical effi 42.8%, Heat Effi 42.3% and total Efficiency 85.1%, synchronized with utility and export energy by use of feed-in-tariffs-policy of green power from the government…
•Project Name: 1.6MW Biogas MWM COGENERATION (400V, 50Hz)
•Working Area: Indonesia (Waste Water Treatment Plant)
•Gas Fuel: Sewage Methane Based Biogas
•Genset Type: Modular Containerized Intelligent CHP for Outdoor Application
•Gensets Numbers: 2x800kW working in parallel
•Actual COP Output: 1600kW
•Operating Mode: Working in parallel, synchronized with state grid to export energy.
•Genset Model: EW-800B5
•Rated Electric Power: 800kWe
•Rated Thermal Power: 791kWt
•Electric Efficiency: 42.8%
•Heat Efficiency: 42.3%
•Total Efficiency: 85.1%
•Gas Engine: MWM TCG3016V16/CG-132-16
•Burn Technology: Advanced Lean Burn Technology
•Cooling Method: Heat Exchanger Water Cooling for Cogeneration Unit,Emergency Closed Water Cooling by Table Fan Radiator
•Alternator: Leroy Somer LSA Series (AREP for PMG System)
•Control System: Intelligent closed loop control, Synchronization Parallel Control System for Cogeneration
•Governor/Actuator: Standard configured by MWM Germany
•Air-Gas Mixer: Standard configured by MWM Germany
•Ignition System: Standard configured by MWM Germany
•Spark Plugs: Standard configured by MWM Germany
•Gas Train: Ball Valve, Gas Filter, Pressure Regulation Valve, Pressure Gauge, Solenoid Valv, Flame Arrestor etc.Make/brand Germany Dungs etc.
•GCB: Schneider Electrically Operated
•Gas Fuel Consumption: 0.46 CBM/kWh
•Lub Oil consumption: <0.1 g/kWh
•Special Demand: Jacket water heater due to the low ambient temperature.Remote control panel & Cloud Monitor
•Working Mode: Non-stop energy-supply, 24hours /7 days
•Applications: WtE project, methane biogas from water treatment through desulfurization and gas-pretreatment-equipment, make generation of electricity & hot water & cooling water to form comprehensive trigeneation system, export energy to utility by green-power Feed-in-Tariffs.
•Commissioning year: 2017